( ! ) Warning: Undefined array key "license" in /home/neoconcretegroup/public_html/wp-content/plugins/elementor-pro/license/api.php on line 330
Call Stack
#TimeMemoryFunctionLocation
10.0005487488{main}( ).../index.php:0
20.0008487920require( '/home/neoconcretegroup/public_html/wp-blog-header.php ).../index.php:17
30.0013488928require_once( '/home/neoconcretegroup/public_html/wp-load.php ).../wp-blog-header.php:13
40.0016489824require_once( '/home/neoconcretegroup/public_html/wp-config.php ).../wp-load.php:50
50.0039491784require_once( '/home/neoconcretegroup/public_html/wp-settings.php ).../wp-config.php:96
62.317817403208do_action( $hook_name = 'init' ).../wp-settings.php:771
72.317817403424WP_Hook->do_action( $args = [0 => ''] ).../plugin.php:522
82.317817403424WP_Hook->apply_filters( $value = '', $args = [0 => ''] ).../class-wp-hook.php:365
92.324217412312Elementor\Plugin->init( '' ).../class-wp-hook.php:341
102.324317412432Elementor\Plugin->init_components( ).../plugin.php:623
112.469517929088Elementor\Core\Modules_Manager->__construct( ).../plugin.php:705
122.553018428272Elementor\Modules\Promotions\Module::is_active( ).../modules-manager.php:63
132.553018428272Elementor\Utils::is_license_active( ).../module.php:41
142.555218428440ElementorPro\License\API::is_license_active( ).../utils.php:642
Health & Safety – Neo Concrete Group

At NEO Concrete Group, safety is our number one priority. 

Our team is committed to the highest level of safety standards at the office, on the job site and wherever we work. Our stringent safety policies mean that whenever we are on your job site, we are working to the highest safety standards. The safety policies align with the Work Health and Safety Act 2011.  Our expert team of operators on our job site work by the values of safety first. 

We commit to:

  • Improving processes and systems
  • Putting staff first 
  • Continual training
SAFETY WORK METHOD STATEMENTS (SWMS)
  • Concrete Boom Pump
  • Concrete Construction – Pour and Finish
  • Concrete Cutting and Sawing
ACTIONS TAKEN TO CONTROL RISK
  • Eliminate the hazard and the associated risk
  • Substitute the hazard with something safer
  • Isolate the hazard from people (e.g., barrier, wall)
  • Physical controls including guards, mechanical devices
  • Work methods or procedures to minimise exposure
  • Provide protective clothing and equipment to workers
MEASURES USED TO ENSURE COMPLIANCE WITH SWMS
  • Responsible person appointed to monitor compliance with SWMS by workers
  • Site-specific inductions; pre-start meetings and toolbox talks with workers
  • SWMS provided to and discussed with workers and signed off
  • Ongoing workplace supervision by competent personnel
  • Monitoring of work methods and review of SWMS where necessary
  • SWMS control measures revised if work methods or risks change
COVID-19 UPDATE

Our team is equipped with the highest safety standards to combat the effects of COVID-19 on the job site. Our staff adapted – and is continuing to adapt – to the changing work environment in Western Australia. Across our business, we have implemented measures such as increased personal hygiene, social distances and appropriate equipment.

Building a solid foundation for Perth’s future